COD_Central Plant Upgrade Phase 1 Bid No. 41-98P-0600-CPU-Phase 1
Remove and reinstall an existing 300 Ton Chiller at the Central Plant. This work includes installation of all required infrastructure and utilities to reconnect the Chiller to the System.
Addendum #1
(click to expand/collapse)
Name | Size | |||
CP Upgrade Addendum 01 Pkg- 01.18.2024 | 594.4 KB |
Addendum #2
(click to expand/collapse)
Name | Size | |||
CP Upgrade Addendum 02 Pkg 01.31.2024 | 3.0 MB |